The northbound right lane of the Ballard Bridge will once again be closed today from 10 a.m. to 2 p.m. for continued work on the lighting system. The sidewalk also remains closed for bridge painting by a contractor working for SDOT.
Four light poles are being replaced as a temporary measure until next year when all of the lighting on the bridge will be replaced. Motorists can expect slight delays northbound as a result of the lane closure.