Crews from the Seattle Department of Transportation plan to close the northbound, right lane of the Ballard Bridge from 9 a.m. to 3 p.m. on August 2-6 to install light pole brackets. Pedestrians will be assisted on the sidewalk by a traffic flagger.
This work is subject to change in the event crews are called to perform emergency work at an alternate location.
For more information: John Dahle, (206) 386-1581
Media contact: Marybeth Turner, (206) 684-8548