SDOT paving crews have been preparing to pave a block on Beach Drive SW, from SW Oregon Street to SW Snoqualmie Street. They now plan to pave on Sunday, October 18, if the weather cooperates. All traffic will share one lane, assisted by a traffic flagger.
The paving is needed to restore the street surface.