SDOT crews crews will work on Eastlake Ave E on Saturday, May 9, from 8 a.m. to 8 p.m. in the 2800 and 2900 blocks, between E Allison Street and E Hamlin Street.
Traffic lanes will be shifted, with one lane open in each direction.
Sidewalks will remain open. There will be some on-street parking restrictions.
The crews will repair pavement that was previously excavated for work on underground utilities.
For more information, please call (206) 684-ROAD (684-7623)
Media contact: Marybeth Turner, (206) 684-8548