Archive for July 31st, 2009
East Duwamish Waterway Bridge, Aug 1-2
SDOT will close one lane on the East Duwamish Bridge for paving at 4 p.m. on Saturday Aug 1 to 2 p.m. Sun afternoon, Aug 2. One lane in each direction will remain open. SDOT's contractor will pave. The sidewalk on the southern side of the bridge will remain closed.[More]
Posted: July 31st, 2009 under Bicycles, Pedestrians, SODO, Southwest Seattle.
Duwamish Trail–portion closed for repairs Aug 3-7
SDOT will repair the Duwamish Trail between SW Idaho and SW Brandon streets. Pedestrians and bicyclists will be detoured to West Marginal Wy SW. The trail will be closed on Mon and Tue, Aug 3-4, from 7 a.m. to 3:30 p.m. each day. The trail may be closed 24-hours-a-day Wed-Fri, Aug 5-7. More[More]
Posted: July 31st, 2009 under Bicycles, Southwest Seattle, Traffic Advisories.



